SCHEDULE R - RESIDENTIAL SERVICE

AVAILABILITY: Residential purposes in towns, villages, farming areas, permanent rental units, and farming related non-residential uses subject to the established rules and regulations of the Association. To small rural civic services where the transformer capacity does not exceed 10 kVa. This rate not for resale.

SHEDULE GS - 1 PHASE - GENERAL SERVICE

AVAILABILITY: Available for commercial, or industrial purposes, including lighting, heating and power, subject to the established rules and regulations of the Association. Rate not for resale.

SHEDULE GS - 3 PHASE - GENERAL SERVICE

AVAILABILITY: Available for commercial, industrial purposes or three-phase farm service for all uses, including lighting, heating and power, subject to the established rules and regulations of the Association where Association's facilities have adequate capacity. Rate not for resale.

SHEDULE GW - GREENWAY RATE FOR SCHEDULE R AND SCHEDULE GS-1

AVAILABILITY: The green (renewable) power option is available to Residential (Schedule R) customers and General Service (Schedule GS-1) customers.

SCHEDULE I - IRRAGATION

AVAILABILITY: This schedule is for alternating current, at the Association's available voltage through a single point of delivery used exclusively for pumping water for agricultural purposes for either irrigation or soil drainage located on or near Association's facilities of adequate capacity. Subject to the established rules and regulations of the Association. Limited to pumps of 5 H.P. or more. Rate not for resale.

SCHEDULE IS-2 - INDUSTRIAL SERVICE

AVAILABILITY: Available for Consumers who take service directly from the Association's 4,160 volt, 12,500 volt or 24,900 volt substation bus. Subject to the established rules and regulations of the Association.

SCHEDULE IS-3 - INDUSTRIAL SERVICE

AVAILABILITY: At facilities of adequate capacity; Three-phase alternating current service at 480 volts or higher; For Consumers with one (1) metering point with loads in excess of 2,500 kW or an aggregation of multiple meters with a non-coincidental sum of demands in excess of 2,900 kW. Contribution-in-aid required for facilities to connect Consumers to Association facilities of adequate voltage and capacity. Rate shall apply during project construction period. Power purchased under this rate schedule is not for resale.

SCHEDULE IS-4 - INDUSTRIAL SERVICE

AVAILABILITY: At facilities of adequate capacity; Three-phase alternating current service at 4160 volts or higher; One metering point for loads in excess of 1500 KW. Contribution-in-aid required for facilities to connect Consumer to Association facilities of adequate voltage and capacity. Rate shall apply during project construction period. Power purchased under this rate schedule is not for resale. Written Agreement for Service required. Schedule also applies to Consumers who supply a portion of their load requirements by self-generation and require the Association to supply Supplementary, Backup, and/or Maintenance power and energy.

SCHEDULE LP - LARGE POWER SERVICE

AVAILABILITY: Available to Consumers located on or near Association's three-phase lines of adequate capacity for all types of usage, subject to the established rules and regulations of Association. Service under this schedule is limited to consumers whose load requirements are equal to or exceed 50 kVa of transformer capacity. This rate not for resale.

SCHEDULE LPP - LARGE POWER PRIMARY SERVICE

AVAILABILITY: Available to Consumers located on or near Association's primary lines of adequate capacity for single-phase or three-phase service at 7.2/12.47 KV or 14.4/24.9 KV to Consumers who furnish and maintain their own transformers, subject to the established rules and regulations of Association. Service under this schedule is limited to consumers whose load requirements exceed 50 kVa of transformer capacity. This rate not for resale.

SCHEDULE LPS - LARGE POWER SECONDARY SERVICE

AVAILABILITY: Available to Consumers located on or near Association's primary lines of adequate capacity for single-phase or three-phase service at 7.2/12.47 KV or 14.4/24.9 KV to Consumers who furnish and maintain their own transformers, subject to the established rules and regulations of Association. Service under this schedule is limited to consumers whose load requirements exceed 50 kVa of transformer capacity. This rate not for resale.

NET METERING-1 PHASE

The Cooperative’s Net Metering Program described herein shall be available to the Cooperative’s retail tariff Customers under the following conditions: Net Metering Customer operates a Customer-owned Generation system that supplies part or all of Customer’s electrical energy needs and may produce energy in excess of Customer’s electrical energy needs. Customer-owned Generation System operates in parallel with Cooperative=s electrical system, must have the same nominal voltage, frequency, and electrical phasing output as Customer’s electrical service from Cooperative, must not exceed 25 kW of capacity, must be a fuel cell or driven by renewable energy derived from wind, sun, or water, and must be located on Customer’s premises.

NET METERING-3 PHASE

The Cooperative’s Net Metering Program described herein shall be available to the Cooperative’s retail tariff Customers under the following conditions: Net Metering Customer operates a Customer-owned Generation system that supplies part or all of Customer’s electrical energy needs and may produce energy in excess of Customer’s electrical energy needs. Customer-owned Generation System operates in parallel with Cooperative=s electrical system, must have the same nominal voltage, frequency, and electrical phasing output as Customer’s electrical service from Cooperative, must not exceed 75 kW of capacity, must be a fuel cell or driven by renewable energy derived from wind, sun, or water, and must be located on Customer’s premises. Download the Application here.

SCHEDULE UL - UNMETERED OUTDOOR LIGHTING

AVAILABILITY: At any point on Association's interconnected system. This rate is not for resale.

INDUSTRIAL LOADS EXCEEDING 2.5 MW (NO .PDF AVAILABLE)

For customers with loads exceeding 2.5 MW, Moon Lake Electric requires a contract that includes facilities and services. This contract will also include the rates for demand, energy and facilities charges. Please contact Jared Griffiths at (435) 722-5400, ext. 5456 for additional details.